The re-fit work continued during the 2012-2013 season. This season we focused on a complete re-rigging of the boat. We worked with a professional rigger, imported all the rig bits & parts from Swendsen's Rig Shop (Alameda, CA), and pulled the mast. A HUGE job....but no more microscopic cracks!
2012-2013
Boat was rerigged by professional rigger. This project involved Pin to Pin new standing rigging including all the turnbuckles. Swaged fittings are used on stainless steel wire. The
mast was pulled and inspected. The mast, spreaders, and boom vang were repainted. New tricolor housing, VHF wiring, and
mast head indicators installed.
All new standing rigging 2012-2013. Mast repainted. |
Profurl
furling unit rebuilt with new bearings and seals.
Rebuilt Furling Unit with new bearings and seals |
Raymarine
i70 instruments added