Monday, October 28, 2013

2011-2012 Work on Magic

Every year a few more projects.  Here is the major work during 2011-2012:


2011-2012
            Both Volvo 2030 B engines were professionally rebuilt.  The starboard engine rebuild included a new head.    Two Balmar high output alternators were added along with a Balmar Center Fielder.  During the rebuild new ignition switches, new engine instruments, and Teleflex Twin Controls were installed.  Twin controls provide 1 set of controls (forward/reverse and speed) for each engine.


STB engine

Solar controller, radio antenna tuner, main battery switches, windlass switch
In step down area to port engine room.

Port engine

Diesel filtering system including values to transfer and polish diesel in 2 tanks.
Located STB engine compartment

            Two Kyocera 215 solar panels were added to the stern davits for 430 watts of solar.  In the starboard engine compartment, a TriStar MPPT Solar Charger Controller was installed.  

Solar panels -- 430 watts
            Boat painted with 3 coats Awlgrip paint.  Topsides repainted 20l0. 
            
            Head hoses replaced
            
            Custom tool box installed amidships on port.

            Cockpit seating upgraded as part of the project to paint the boat.  Previous cockpit seating of teak slats were removed.  The new seats are custom fabricated marine ply trimmed with teak and sealed with System 3 resin and nonskid.

            Standard Horizon VHF radio with AIS and RAM mic

            Webasto ignition coil replaced for hot water and boat heating


Webasto heater for hot water and forced air heating in boat

No comments:

Post a Comment